Building Permit/Final Inspection Status |
| Name |
[Crimson Ridge Extension & 2710 East Street] |
| Number |
Grading-42645 |
| Drawing of Record Submitted |
7/28/2011 |
| Electronic Drawing
of Record Submitted |
7/28/2011 |
| Final Grading Report
Submitted |
7/28/2011 |
| Date Scheduled |
8/01/2011 |
| BUILDING
PERMIT RELEASE APPROVALS |
| Power |
|
| Water |
|
| Waste |
|
| Engineering |
|
| City Development Engineer |
|
| Landscaping |
|
| FINAL
INSPECTION RELEASE APPROVALS |
| Power |
|
| Water |
8/5/11 corrections required per Kevin C. Turn and pain hydrant. Pour pad around hydrant. Need to check wire.
8/16/11 approved per Kevin C.
6/5/12 - 1 year warranty corrections required per Kevin C. Need one more year after final on Phase 4 of Silkwood because Quality dug into street for utilities. |
| Waste |
8/5/11 approved per Lee K. |
| Engineering |
8/2/11 corrections required per Brandon W. File NOT. Provide 10% warranty bond with city. Finish monuments.
8/15/11 approved per Brandon W.
6/4/12 - 1 year warranty - corrections required per Brandon W. Need additional year warranty on Crimson Ridge Dr for Silkwood Phase 4. |
| City Development Engineer |
8/15/11 approved per Brett B. |
| Landscaping |
8/15/11 approved per Brett B. |