Building Permit/Final Inspection Status |
| Name |
Primrose Point Phase IV |
| Number |
Grading-37098 |
| Drawing of Record Submitted |
03/09/2007 |
| Electronic Drawing
of Record Submitted |
03/09/2007 |
| Final Grading Report
Submitted |
03/12/2007 |
| Date Scheduled |
03/15/2007 |
| BUILDING
PERMIT RELEASE APPROVALS |
| Power |
|
| Water |
|
| Waste |
|
| Engineering |
|
| City Development Engineer |
|
| Landscaping |
|
| FINAL
INSPECTION RELEASE APPROVALS |
| Power |
3/20/07 Approved per Dennis Wright.
7/2/08 - 1 year warranty - approved per Dennis Wright. |
| Water |
3/19/07 Approved per Wayne M.
7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good |
| Waste |
3/15/07 Corrections required per Lee Kell. Move gas line min of 5' off sewer on Arroyo Dr.
04/16/2007 Approved per Lee Kell
12/22/08 - 1 year warranty - approved per Lee K. |
| Engineering |
3/14/07 Corrections required per Carlos R. Gas line Incorrect.
6/20/07 corrections required per Carlos R. Did gas line issue get resolved? upper lots - grading.
7/19/2007 Approved per Carlos Robles
7/15/2008 Approved per Carlos Robles 1 yr warranty |
| City Development Engineer |
3/15/07 Corrections Required per Cathy H. Electronic dwg of record needs to be adjusted into state plane (NAD 83) coordinate system. Per Ken B. Spawling and pitting of asphalt. Heavy equipment marks in asphalt. Rock wall over 8' high and built past center line, heavy equipment parked on the streets.
6/20/07 corrections required per Ken B. Still installing rock retaining walls.
8/3/07 approved per Cathy with Conditions. Lots 30-38 and 39-41 need to come in with site grading plan with building permit.
7/2/08 - 1 year warranty - approved per Ken B. |
| Landscaping |
3/15/07 Approved per Ken B.
8/3/07 approved per Cathy with Conditions. Lots 30-38 and 39-41 need to come in with site grading plan with building permit.
7/2/08 - 1 year warranty - approved per Ken B. |